Vibro Piling Foundations at Walsall Road, Willenhall

by Andy Evans, in Development News , New Homes

Construction started last week at our development of 25 New Homes on Walsall Road in Willenhall with the ground works team clearing and levelling the site and laying hard standing areas ready to support the vibro piling rig. This week the vibro piling team are installing compacted stone columns to stabilise and improve the load…

Site preparation work at Walsall Road, Willenhall

by Andy Evans, in Development News , New Homes

Today we had a JCB and small team on site in Willenhall carrying out soakaway tests, digging foundation trial trenches and gathering information to feed into the structural engineering design team. The information gathered will enable the structural engineers to finalise the foundation, roadway and drainage designs for the 25 new homes that we are…

Wonderful Homes acquires land to build 25 new houses in Willenhall, Walsall, West Midlands

by Andy Evans, in Development News , New Homes

Located in the Black Country, off Walsall Road, Willenhall, on the site of the former Comet store, our latest new homes development “Aldermans Place” is conveniently located less than a mile from Willenhall town centre and the recently completed new Morrison Supermarket, and just 1.4 miles from Junction 10 of the M6. Construction of the…

Lorely Burt MP opens Wonderful Homes Gospel Mews Development

by Andy Evans, in Development News , Land Wanted

Lorely Burt, Member of Parliament for Solihull, attended our open day to officially open our Gospel Mews development and to help us celebrate the completion of the first plot. The event was a huge success with over 50 people attending including the house buyers and their families, suppliers, contractors and the sales team from our…

Driveway block paving work continues at the 5 new homes we’re building for sale in Acocks Green, Birmingham

by Andy Evans, in Development News

It’s the end of our 38th week and the last day of work on site for almost 2 weeks as we shut down for Christmas and New Year. The block paved driveway is now almost complete, we’ve laid turf to the back gardens and internally all the houses are nearing completion. Watch this weeks video…

Driveway block paving work starts at the 5 new homes we’re building for sale in Acocks Green, Birmingham

by Andy Evans, in Development News

At the end of our 37th week we’ve finished building up the stone base for the driveway and have started laying the block paving. Also this week we’ve been carrying on with internal finishes including hanging doors, fitting kitchens and decorating. Watch this weeks video to see the block paving being laid and to see…

Work on the driveway continues at Gospel Mews, the new homes we’re building for sale in Acocks Green, Birmingham

by Andy Evans, in Development News

It’s the end of our 36th week and work on  the front driveway has continued with the edging curbs now all in place ready for several hundred millimetres of stone to go in to form the self draining base for the block paved drive surface. Also this week we’ve completed the build of Plot 5 and…

All plots at Gospel Mews now Reserved

by Andy Evans, in Development News , Land Wanted

We’ve now agreed a sale and taken a reservation deposit on the last remaining plot at Gospel Mews, so that’s all of the plots now reserved. All our attention is now focused on getting the build of the houses completed and finding our next development site. If you have a development site / land that could…

Landscaping at Gospel Mews, the new homes we’re building for sale on Gospel Lane, Acocks Green, Birmingham

by Andy Evans, in Development News

It’s the end of our 35th week and work on landscaping the front driveway is now well under way. We’ve had to reduce the ground level by around half a metre in order to build up a stone base for the block paved driveway so that it will self drain instead of needing drainage connected to…

Second fix continues at Gospel Mews, the new homes we’re building for sale on Gospel Lane, Acocks Green, Birmingham

by Andy Evans, in Development News

It’s the end of our 34th week and second fix is now well underway with most of the skirting boards, architraves and staircase balustrades fitted and bathrooms tiled. The decorators have also started with plot 5 pretty much decorated throughout. Outside we’ve been carrying on with the landscaping, but progress has been severely hampered by the torrential rain we’ve been experiencing again.…